Location:
Vitoria Gasteiz, Spain
Business area:
Construction
Project:
EBA’s Towers- 22 Floors
Client:
Grupo EBA-Grupo San José
Year:
2006/07- 14 months
Work done:
Reinforced concrete structure and assembly of Iron.
Localisation:
Vitoria Gasteiz, Spain
Secteur d’activité:
Construction
Project:
EBA’s Towers- 22 Floors
Client:
Grupo EBA-Grupo San José
Année:
2006/07- 14 mois
Travail effectué:
Structure en béton et l’assemblage de fer
Location:
Vitoria Gasteiz, Spain
Business area:
Construction
Project:
EBA’s Towers- 22 Floors
Client:
Grupo EBA-Grupo San José
Year:
2006/07- 14 months
Work done:
Reinforced concrete structure and assembly of Iron.
Location:
Vitoria Gasteiz, Spain
Business area:
Construction
Project:
EBA’s Towers- 22 Floors
Client:
Grupo EBA-Grupo San José
Year:
2006/07- 14 months
Work done:
Reinforced concrete structure and assembly of Iron.
Localização:
Vitoria Gasteiz, Espanha
Área de negócio:
Construção Civil
Obra/ Projeto:
Torres EBA 22 pisos
Cliente:
Grupo EBA-Grupo San José
Ano/ Duração da Obra:
2006/07- 14 meses
Trabalhos realizados:
Estrutura de betão e montagem de ferro.